← 공개 라이브러리

End-of-day building walkthrough

by MASTER

Quick guided routine to secure windows and doors, switch off lights, set the alarm, and record maintenance issues at shift end.

Fecit 앱에 저장하기
이 루틴을 Fecit 앱에서 열어 내 라이브러리에 추가하세요.

내용 미리보기

End-of-day building walkthrough

Quick guided routine to secure windows and doors, switch off lights, set the alarm, and record maintenance issues at shift end.

⏱ 30분 ★ 보통
현재

Some exterior or interior doors and windows may be open or unlocked, non-essential lights may remain on, the alarm may be unset, and maintenance issues are unrecorded.

난관

The building spans multiple zones with different lock types and alarm panels, keys and access cards are grouped on a single set, and several inspection areas are dimly lit which slows verification.

기대

All doors and windows are closed and locked, non-essential lights are turned off, the alarm is armed, and any maintenance issues are logged with location and a brief description.

도구
  • • Flashlight — 1
  • • Key set and access cards — 1
  • • Mobile device — 1
단계
  1. 01
    Secure doors and windows
    Follow the floor checklist; at each listed door and window, close it, engage the lock, verify the latch by pulling, and mark any that fail to latch in the log.
    ⏱ 15분
  2. 02
    Switch off lights and check sensors
    Turn off all non-essential light switches on the floor list, check motion-sensor zones remain idle, and note any fixtures or sensors that stay on or act abnormally.
    ⏱ 5분
  3. 03
    Arm alarm panels
    Visit each alarm panel listed for the zones, confirm there are no fault indicators, enter the arm code or use the access app, and confirm each panel displays 'armed'.
    ⏱ 5분
  4. 04
    Log maintenance issues and finalize report
    Using the mobile device, create entries for each issue with location, a one-sentence description, and a photo; submit or flag high-priority items and sign off the end-of-day log.
    ⏱ 5분